保质期 | 24个月 | 按溶剂类型分 | 粉末涂料 |
---|---|---|---|
颜色 | 灰色 | 单件净重 | 25kg/桶 |
干燥时间≤ | 5小时 | 耐水性 | 超强 |
美国进口——澎内传401水泥基渗透结晶防水涂料
产品介绍
耐博仕澎内传401水泥基渗透结晶防水涂料是由波兰特水泥,石英砂及多种活性化学物质配制而成具有渗透结晶功能的防水涂料。可为混凝土,水泥砂浆基层提供高效,与结构桶寿命的防水保护。
应用项目
地下室 地下车库 隧 道 管 廊
洞 库 地 铁 桥 梁 污水厂
垃圾仓 渗滤液池 游泳池 海岸建筑
电 厂 核电站 观景水池 斜屋面
饮用水池 水库大坝 码 头 体育场馆
喷涂 粉:水(重量比)=3.5-4:1
涂刷 粉:水(重量比)=3.5-4:1
搅拌器搅拌3分钟待材料混合均匀后放置1分钟后可使用。
搅拌好的材料30分钟内用完,如感觉材料发稠,不可在加水,直接搅拌即可。
防水,防侵蚀用量:1.5kg/㎡
防潮用量:0.8 kg/㎡
储存在干燥环境中,不开封条件下12个月。运输无特殊要求。
1.施工时戴好胶手套,防目镜,口罩等防护用品。
2.本材料为碱性,若溅到眼中,可先用清水冲洗后,就医处理。
3.严禁在雨天,雾天,五级及以上大风时施工,不得在施工环境低于5℃高于35℃或烈日暴晒时施工。
4.施工完毕,涂层未充分固化前,受雨淋,霜冻会影响材料效果。
原材料产地:美国
中国销售商:清远市顶新建材科技发展有限公司
地址:广东省清远市清城区嘉福工业区银盏林场嘉福工业区嘉华路33号
中国技术服务电话:400 8860 553
Product introduction
The 401 cement-based water-proof coating is a kind of water-proof coating which is made of Portland Cement, quartz sand and many kinds of active chemicals. It can provide high-efficiency waterproof protection for concrete and cement mortar base, and the life of structural barrel.
Application Project
Basement, underground garage tunnel tunnel tunnel tunnel cavern subway bridge sewage plant garbage warehouse, leachate tank, swimming pool, coastal building nuclear power plant, viewing pool, inclined roof drinking pool, reservoir dam dock stadium
Method of use
1. BESMEAR BRUSH LAW: Use Hard Wool Nylon Brush, dip material to besmear evenly to finish on the base surface.
2. Coating method: With a special spray gun, will adjust the good material, uniform spraying finished substrate.
3. Dry Sprinkling method: The dry powder is evenly sprinkled on the cushion layer soil or on the initial setting concrete foundation with the Sieve Mesh.
Mixing sequence
SPRAYING POWDER: water (weight ratio) = 3.5-4:1 painting powder: Water (weight ratio) = 3.5-4:1 agitator for 3 minutes until the material is mixed evenly and left for 1 minute to use. Stir the good material within 30 minutes, such as feeling the material hair thick, not in the water, direct mixing can be.
Dosage
WATER-PROOF AND EROSION-PROOF DOSAGE: 1.5 KG/M2
MOISTURE-PROOF DOSAGE: 0.8 kg/m2
Storage and transportation requirements
Store in a dry environment, unopened for 12 months. No special requirements for transport.
Points to note
1. Wear rubber gloves, goggles, masks and other protective supplies during construction.
2. This material is alkaline, if splashes in the eye, may use the clear water to rinse first, seeks medical treatment.
3. It is strictly forbidden to work on rainy days, foggy days, when there is a strong wind of level 5 or above, or when the working environment is below 5 °C and above 35 °C or when it is exposed to the sun.
4. After construction, the coating is not fully solidified before rain, frost will affect the material effect.
ORIGIN OF RAW MATERIALS: United States
Chinese seller: Qingyuan top New Building Materials Technology Development Co. , Ltd.
Address: No. 33, Jiahua Road, Jiafu industrial zone, Yinzhan forest farm, Jiafu Industrial Zone, Qingcheng District, Guangdong Province
China Technical Services Tel: 13926411508
>> 了解更多信息
1、您想了解更多的商家信息吗? 可以点击按钮,了解更多详细。
2、您可以请点击按钮,查看更多功能建筑涂料商家。
3、想查点看更多产品信息,可以查看 功能建筑涂料产品库,了解更多。
4、在线联系
Tel:
Tel:
Tel:
Tel: