颜色 | 各色 | 耐水性 | 优 |
---|---|---|---|
耐洗擦性 | 8000 | 按溶剂类型分 | 油性漆 |
推荐施工方式:刷涂或喷涂。面漆建议用喷涂施工,漆膜效果更佳。
施工工艺:涂装工艺(以水曲柳板为例)
耗漆量(理论值):面漆:8-10平方米/公斤(混合液,刷涂一遍的耗量)
底漆:5-7平方米/公斤(混合液,喷涂一遍的耗量)
(因基材、涂料颜色和效果不同,耗漆量会有所不同)
干燥时间(温度25℃、相对湿度75%):表干时间小于60分钟 实干时间12小时
可使用时间(温度25℃、相对温度75%):油漆混合后应在4小时以内用完。
重涂时间(温度25℃、相对湿度75%):
如果采用湿喷湿涂饰方法,在漆膜表干以后马上重涂,中间无需打磨。但底
漆施工4小时,面漆施工8小时后如果还要进行下步涂装,则必须对涂层进行
打磨,以增加漆膜间的附着力。
施工注意事项:
①配漆时,将罐内油漆充分搅拌均匀,按规定比例调配,再次搅拌均匀,静
置10分钟后过滤使用。
②请将被涂物表面的灰尘、颗粒清理干净,再涂饰下一道漆。
③开罐后若油漆不能一次用完则必须即时密封。
④请配套使用本公司产品,以免引起不良反应。
⑤请根据温度的变化选择配套的稀释剂。
⑥基材的含水率应与当地的平衡含水率相当,表面要求干燥清洁。
⑦施工时应配戴防护用具,并保持良好通风。
⑧请根据施工难度和漆膜效果及时改变稀释的加入量。
储存方式:密闭存于阴凉干燥处,远离明火及热源。
符合国家标准:GB18581-2001
Recommended
construction method: Brush or spray. Spray paint is recommended,
the film better.
Construction Technology: coating process (as Ash board as an
example)
Consumption of paint (theoretical): finish 8-10 square meters / kg
(the mixture, brush over the consumption)
Primer :5-7 sq m / kg (the mixture, spraying over the
consumption)
(Due to the substrate, coating with different colors and effects,
the consumption of paint will vary)
Drying time (temperature 25 ℃, relative humidity 75%): dry time of
less than 12 hours, 60 minutes drying time
Can use the time (temperature 25 ℃, relative humidity 75%): paint
mixture should be used within 4 hours.
Recoat time (temperature 25 ℃, relative humidity 75%):
If the wet-jet wet coating method, immediately after the film is
dry coating weight, in the middle without polishing. But at the
end
Construction paint 4 hours, 8 hours after the finish the
construction but also the next step if the coating, the coating
must be
Polished, in order to increase the adhesion between the film.
Construction Notes:
① with paint, paint the tank, stir, according to the provisions of
the proportion of allocation, stir again, the static
10 minutes after the filter is set to use.
② Please be coated surface of the dust particles to clean up, and
then finishing the next coat of paint.
③ If the paint can that can not run out of time must be immediately
sealed.
④ Please supporting the use of our products, so as to avoid adverse
reactions.
⑤ Please select the package according to the temperature change of
the diluent.
⑥ the moisture content of the substrate should be fairly local
equilibrium moisture content, surface requires dry and clean.
⑦ construction should wear protective equipment, and maintain good
ventilation.
⑧ film according to difficulty of construction and the addition of
dilution effect of changes in the amount of time.
Storage: kept in a cool dry place sealed, away from open flame and
heat.
Meet the national standard: GB18581-2001
公司外景图片